|
NAVIGATION
Home
Visitor's Forum
News and Updates
Frequently Asked Questions
CSR Villages
Room Info
Suite Info
Club Level Rooms
Room Location Suggestions
Dining Options
Lounge Options
Transportation Info
The Dig Site Pool
Convention List
Ikon Business Center
La Marina
Health Club and Spa
Panchito's
Internet Service
AC Override Instructions
Night Photos
Holiday Photos
CSR Video Clips
CSR Tidbits
What Others Think
Links

CSR TIDBITS
- Ground breaking - August 30, 1995
- Grand Opening - August 1, 1997
- Architects: Designed under the direction of Walt Disney Imagineering
- Design Architect: Graham Gund Architiects of Cambridge, MA
- Architect of Record: Glover Smith Bode, Inc. of Oklahoma City, OK
- Landscape Architect: E.D.A.W.
- Interior Decor: Daroff Designs
- The chairs located in the guest tooms were imported from Argentina and are made of ironwood. (the chairs prior to the renovations in 2009)
- 46,000 cubic yards of concrete and more than 3,000 tons of rebar were used in the construction of the guest room buildings.
- Coronado Circle is 1.65 miles in length, this is the roadway that the buses use.
- The Esplanade is .90 miles in length, this is the path around Lago Dorado.
- Lago Dorado is a 15 acre, 25 foot deep crafted lake.
- The Dig Site Swimming Pool: is 120-by-90 and contains 272,912 gallons of water.
- Paint: more than 200 varieties/colors of paint were used for CSR.
- Trees planted at the resort came from 10 different states and were imported from as far away as Palm Springs, CA.
- Pallet Mulch: the mulch used in the landscape beds consists of shredded wood from recycled pallets.
| |